What should I charge for drywall work?
Drywall is usually priced per square foot or per board to hang and finish, but the price has to cover board, mud, tools, the truck, and the hauling. Build each bid from your labor and materials plus a markup that covers that overhead, and the per-foot price is set.
Price a job the way contractors actually do it: add up what the job costs you, then add a markup for your overhead and profit. Fill in your numbers — your bid updates as you type.
| Materials & supplies | $0 |
| Your labor (0 hrs × $0) | $0 |
| Hired help | $0 |
| Other direct costs | $0 |
| Your costs (subtotal) | $0 |
| Markup (30% — overhead & profit) | $0 |
| Bid price | $0 |
Pricing method and standard percentages from contractor-industry sources (Angi, Buildern, NAHB): overall contractor markup 20–30%, materials markup 7.5–35%, labor markup 25–50%, recommended profit margin 15–25%. A markup is a percentage of your costs; the resulting margin (share of the bid that's profit) is lower — both are shown above. These are general benchmarks, not a guarantee for your market.
What your markup has to cover
The markup in your bid covers the costs no single job shows. For drywall work, your overhead typically includes the truck and fuel, lifts and stilts, taping and sanding tools, consumables (mud, tape, screws, sandpaper), liability insurance, and dust control and dump fees. None of that appears on one job, but all of it is paid out of the markup added to every job. Published contractor guidance (Angi, NAHB) puts a typical overall markup at 20–30%.
Be realistic about your hours
Finishing is a multi-day cycle — hang, tape, then coats with drying time between — and cleanup of drywall dust is a job in itself. Per-square-foot pricing works only if you have counted taping, sanding, and the back-and-forth trips, not just the hanging.
Drywall Installer pricing FAQs
How is drywall usually priced?
Most often per square foot of board (a 4×8 sheet is 32 sq ft) to hang and finish, or per board. Estimate the sheets and your hours, apply your hourly labor rate, and add materials and a level-of-finish premium for smooth (Level 5) walls.
Should hanging and finishing be priced separately?
Yes — many drywallers quote hang and finish as separate line items because finishing (taping, coating, sanding) is the slower, more skilled half. Separating them lets you bid hang-only or finish-only work accurately.
What raises a drywall price?
High or vaulted ceilings, a higher finish level, repairs that must blend into existing texture, and tight access all add hours. Price those conditions explicitly instead of absorbing them into a flat per-foot number.